Skip to content

86 more specialist and extra care homes being built in Wirral

A report to councillors lists the borough's extra care and supported living schemes and says about nine more sites could deliver 300 or more homes.

Photo of the houses, due in 2027 in Moreton.
An eye for what the homes in Driftwood Gardens could look like. Photo: Housing Care.

Table of Contents

Wirral has 636 homes in extra care, supported living and other specialist housing schemes, and 86 more are on the way, according to a council report.

The report goes to Wirral Council's adult social care and public health committee on Tuesday 24 November.

It says demand for accessible, affordable and specialist housing keeps rising because of an ageing population and more complex care needs.

The 86 homes either under construction or going through planning are:

  • Driftwood Gardens, Pasture Road, Moreton – 80 extra care homes for older people, due in 2027. The homes will feature 1 and 2 bedroom options, with a lift, lounge, a dining room and on-site staff.
  • Prenton Hall Road – six homes for people with complex learning disabilities or autism, due in 2027.

About nine more sites around the borough are being looked at, with the potential for about 300 or more homes. The report does not name them, saying some are commercially sensitive.

The existing schemes range from Cherry Tree, ten homes for people with early-onset dementia opened in 2007, to Spinnaker House, which has 102 extra care homes and opened in 2024.

The most recent is Osbourne Road, eight homes for people with mental health needs, which opened this year.

The report says demand is greatest for extra care, affordable accessible housing and specialist homes for adults with learning disabilities, autism, mental health needs and complex support needs.

It also says a shortage of general housing can stop people moving on from specialist homes when their needs reduce.

In 2025/26 the council completed 3,104 home adaptations through the Disabled Facilities Grant and other services, with 743 more in April to June this year. Its grant for 2026/27 is £6.07m.

Work started in July on the £18.5m extra care scheme in Moreton.

A supported housing needs assessment and five-year supported housing strategy are being drawn up and will go to councillors after May 2027.

Comments

Latest